AXi 2820/18, special, long lead wire, short shaft


AXi 2820/18 brushless motor with 700mm long wires and shortened shaft, with radial propeller driver. This new addition to the AXi 2820 series provides additional torque over the existing 2820 series motors for use in multi-rotor applications and is especially suitable for the SkyJib Lite and similar frames using 14" propellers.
The included radial propeller driver has a 6mm shaft.
Made in Czech Republic.

Technical Details For AXi 2820/18 Short-Shaft
No. of cells (LiPo) 4-5s
RPM/V 670 Kv
Max. Efficiency 85%
No load current 1.0A
Maximum Load 25.0A
Internal Resistance 0.110Ω
Diameter 35.00mm (1.38")
Length 48.00mm (1.89")
Shaft Diameter 5.00mm (0.20")
Max. Efficiency Current 8-20A
Glow Equivalent -
Weight 146.0g (5.1oz.)
  • Model: AXi 2820/18
Ask a Question

$133.77

Add to Cart:

This product was added to our catalog on Friday 28 December, 2012.